Water Infrastructure
Sectional Steel Water Storage Tank
A sectional steel water storage tank erected on reinforced concrete plinths, with a steel roof structure being installed over it and stone-pitched drainage channels formed alongside. Work of this type sits under Primebuild's registration with the Ministry of Water & Sanitation.

What was built
Scope and construction
- Bolted sectional steel panel tank, four panels high
- Raised on cast reinforced concrete plinths with clear underside access
- Steel roof trusses being erected over the tank at the time of the photograph
- Stone-pitched drainage channel and graded hardcore surround
- Operatives working in hard hats and high-visibility clothing
More work
Other projects
Civil & InfrastructureTwin-Cell Box Culvert & Roadside Earthworks
Project details to be confirmed
A twin-cell reinforced concrete box culvert installed beneath a rural road embankment, with a tracked excavator working the surrounding earthworks. Culvert work of this kind is core rural roads infrastructure in Kenya.
View project
IndustrialSteel-Frame Workshop with Gantry Crane
Project details to be confirmed
A steel portal-frame workshop building with profiled metal cladding, served by a rail-mounted gantry crane and supporting an adjacent batching or processing plant. An industrial facility built around the movement of heavy loads.
View project
InstitutionalSwimming Pool Facility & Changing Block
Project details to be confirmed
A completed outdoor swimming pool with tiled lane markings, a natural stone deck with channel drainage, and a masonry changing-room block alongside. The lane configuration indicates an institutional or school facility rather than a private pool.
View projectTell us what you're building.
Send us the scope, the site and the date you need it finished. We will tell you honestly whether we are the right contractor for it.